6-8 Maintenance
Maintenance Schedule
Since the maintenance requirements of the laser system is dependent on the type of material
being run, the quantity of material being removed, the hours of operation, and the quality of the
exhaust blower, it must be user defined.
As a starting point, we recommend the following schedule:
As necessary
Engraving Table
Main enclosure
Top Door Window
Every 8 hours of engraving
Clean X-axis and Y-axis Bearings
Clean X-axis and Y-axis Rails
Clean X-axis Belt
Check Beam Window, #2 Mirror, #3 Mirror, and Focus Lens for contamination. Clean
ONLY if dirty.
Every month
Clean Cooling Fan filters
Clean and re-lubricate Z-axis Lead screws
Check for X-axis and Y-axis Belt wear – replace as necessary
Check and/or clean X-axis and Y-axis Drive Gears
Check for X-axis and Y-axis Bearing wear – replace as necessary
Inspect system for loose screws and mechanical parts – tighten if necessary
Every 6 months
Exhaust Plenum
If you are noticing a considerable buildup of debris on the optics and the motion system, clean
the system at more frequent intervals. If your system has remained relatively clean, you can
extend your cleaning intervals. You need to be the judge but keep in mind that a clean machine
is a better performing machine and can extend the life of the parts as well as reduce the
possibility of down time. If you have any questions about maintaining the laser system, please
contact our Service Department.